Installation Guide
Birrus Installation Service Available (Contact us for more details)
For Recess Applications:
– Ensure recess is clean, level and smooth (for gluing in mat the recess will need an engineered screed or skim coat to ensure adhesion).
– Install angles using glue or mechanical fixings.
– Glue in the mat using a contact adhesive or pressure sensitive glue.
– It is advised that the mat be unrolled and allowed to adjust to climate for 8-24 hours.
For Surface Mounted Applications:
– Unroll the mat and roll the edges down, these will relax over time and lay flat.
– Ensure the substrate is clean from dirt and debris.